group housing for sows

FOB Reference Price:Get Latest Price
US $20-150 / Sets | 20 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Use:
Pig
Type:
livestock for pig
Material:
hot dip galvanized steel, 2.5mm steel tube, welded and hot dip galvanized
Place of Origin:
Shandong, China (Mainland)
Brand Name:
xinfengchen
Model Number:
pig pen
Processing:
Welded and hot dip galvanized.
feeder:
Cast iron/steel
Size:
2200x650x1100mm/customized
Supply Ability
Supply Ability:
3000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
steel pallet/according to customer
Port
qingdao
Lead Time :
15-30 days after payment
group housing for sows
Product Description

pig limitation crate Gestation stall save floor space and limit the activities of the pig,so that the pia can grow faster,convenient feeding and cleaning.

1.Hot-dipped galvanized steel pipe welding,sturdy and durable,anti-corrosion,easy to clean.
2.Saving space,increase of the number of unit area.
3.Easy to feed and feces clean-up,reduce the labor intensity of workers.
4.Convenient for statistical,unified hangtag,infallible not to make a mistake.
5.Independent space,avoid the sows scramble,reduce the abortion rate.

 

 

Model 

gestation for pigs

Size

2.2*0.65m

Pipe diameter

GB 3/4inch

Pipe thickness

2.5mm

Material

Galvanized steel pipe

Process

Whole hot-dip galvanized

 

 1403121609_22.jpg1403191547_9.jpg

 

 

Packaging & Shipping

 

 

 according to customer.jpg

xianweilan1.jpg


 

 

 

 

 

 

Our Services

 

 OEM services

  • Our own Design Engineer team continuously developing new design product, and we are very honored to recommend own design to sincerity customers.
ODM services
  • We can produce the equipments as your requirements if you give us drawings.
  • We can print the logo according your requirement.
  • All specification and design can be customized.

 

 

 

  

 

Company Information

 

 

 

Qingdao Xinfengchen Industry&Trade Co.,Ltd.

  • We having a full array of suitable equipment and staff: three manufacturing shop, arround 150 manufacturing workers, seven welding robot line
  • Have fully mastered the overall processes and control methods of project development and implementation.
  • We have the capability of Technical/Industrial Design Engineer and Trading a team.
  • Our own professional Quality control department

 

  

 

 

product overview

 

 

cattle_.jpg

 

PIG_.jpg

 

trough_.jpg

 

floor_.jpg

 

 

 

 

 

Contact Information

 .jpg